COVID-19: state of emergency and suspension of time limits in real estate law
-Updated 13 May 2020-
The current COVID-19 health crisis led the government to issue an order on 25 March 2020 establishing a two-month state of emergency (until 24 May 2020, a date confirmed by the order of 7 May 2020) and a legally protected period to safeguard the rights of both individuals and businesses in this unprecedented and exceptional context.
The order of 25 March 2020 was highly controversial among property professionals. By suspending many time limits until one month after the end of the state of emergency, that is 25 June 2020, and restarting them from that date, it created a great deal of uncertainty, in particular about the post-lockdown period and its possible economic consequences. It was therefore the subject of an amending order.
DAVID NOTAIRES looks at the main measures of the order of 25 March 2020 concerning property sales, and above all at the adjustments made by the amending order of 15 April 2020.
1) COVID-19 and the SRU withdrawal period
Is the SRU withdrawal period suspended until the end of the state of emergency, set by the government at 24 May 2020?
While there was some doubt about how to read the order of 25 March 2020, which suggested that the SRU period was suspended until 25 June, the order of 15 April expressly clarified this point.
The buyer's withdrawal period is therefore not suspended during the state of emergency; it still starts to run on the day after first presentation, for ten days.
2) COVID-19 and rights of first refusal of public and semi-public bodies (town hall, SAFER)
I have signed a promise to sell my property: do the periods for clearing rights of first refusal continue to run during lockdown?
This question has come up again and again since the start of lockdown and is a great worry for clients and estate agents, who fear files being blocked and processing times getting longer.
After a strong reaction from the notarial bodies and estate agents in particular following the order of 25 March 2020, the government listened to them and reduced the suspension of these periods by the order of 15 April 2020.
Here is a summary table based on the date on which the right of first refusal was notified:
|
Right of first refusal cleared… |
Before 12/01/2020 |
Between 12/01 and 12/03/2020 |
Since 12/03/2020 |
|
Tacit waiver obtained before 12/02/2020, so the deed of sale can be signed |
The period is suspended and will start to run normally again from 24 May, with a minimum, however, of 7 days to obtain a tacit waiver |
The two-month period will start to run from 24 May 2020 |
It should be noted that, although these two orders suspend the periods for clearing rights of first refusal, they do not prevent local authorities and the SAFER (rural land agencies) from expressly waiving their right of first refusal during the state of emergency.
3) COVID-19 and planning permission
I applied for building permission before 12 March 2020: can I obtain tacit approval during the state of emergency?
Here too, the order of 25 March 2020 had worried property professionals, in particular developers and the construction industry, already hard hit by lockdown and the halt of their building sites.
The fear was that these measures would completely paralyse the construction sector for several months after the end of lockdown and push back the start of building work to early 2021.
These suspension periods were also shortened by the order of 15 April 2020.
The rule is now as follows, as set out in the new article 12 ter of the order:
The periods for examining planning applications (planning certificate, prior declaration, building permission) that had not expired before 12 March 2020 are suspended from that date. They will start to run again from the end of the state of emergency (24 May 2020, the government having confirmed this date in its order of 7 May 2020) for the time that remained on 12 March, but for no less than seven days. The same applies to the time limits for challenging such permissions.
4) COVID-19 and the condition precedent of obtaining a loan
I have signed a promise to sell subject to obtaining a loan: is the period suspended during the state of emergency?
Both orders formally exclude time limits set by contract; the period for obtaining the loan is therefore not suspended during the state of emergency.
In practice, this may worry buyers, as loan applications are currently taking longer to process because of the difficulties caused by lockdown. The parties are therefore strongly advised to get in touch with each other, with the notaire's help, to discuss the matter and, if necessary, extend the deadlines for obtaining loan offers.
5) COVID-19 and the time limits of preliminary sale agreements
I have signed a unilateral promise to sell: is the exercise of the option suspended during the state of emergency?
The unilateral promise to sell is a contract with an extinctive deadline: in other words, if I do not exercise the option by the date stated in the promise, I lose the benefit of the promise, which lapses.
The orders do not deal with contracts. So if there is any difficulty in exercising the option, even during the state of emergency, it is essential to contact the seller and the notaire to sign an amendment extending the deadlines for completing the promise to sell.
I have signed a « compromis de vente » (bilateral promise to sell): is the deadline automatically extended?
The vast majority of « compromis de vente » do not have an extinctive end date; the deadline is merely the date from which either party can compel the other to sign, if all the conditions for completing the deed are met. In that case, there is no need to sign an amendment to the « compromis », and the sale can be signed when lockdown is lifted, if the parties cannot or do not wish to complete it before then (an issue linked in particular to moving house during lockdown).
DAVID NOTAIRES has thus discussed with you the main questions raised in property sales since the start of lockdown. During this period, so difficult for everyone, we remain, more than ever, available to help you carry out your projects.
Carine GALMARD-POMME, Notaire